ru | en
Electronic Textbook

Electronic Textbook

Cost:300 000 $
Payback period:upon reqest
Goals and Description:

Create an interactive, accessible and light electronic textbook for every subject in theschool curriculum that will increase the efficiency of learnin…

Plant for Collection and recycling of technical, vegetable and cooking oils

Plant for Collection and recycling of technical, vegetable and cooking oils

Cost:5 million euros
Payback period:*
Goals and Description:

construction of a plant to processvegetable and industrial oils and fatswaste, as well as. Waste under the temperature transits into 3 Products: benzo…

Biogas plant based on domestic solid waste dumpster

Biogas plant based on domestic solid waste dumpster

Cost:4 million euros
Payback period:under 5 years
Goals and Description:Increasing energy independence of the city by electricity degassing landfill, reducing greenhouse gas emissions. Production of “green” energy – up to...
Disposal of solid domestic wastes

Disposal of solid domestic wastes

Cost:300 million euros
Payback period: from 2.5 to 5 s
Goals and Description:

construction of recycling capacity to produce energy resources and other goods from the solid domestic waste into marketable products with a full cycl…

Odessa Silicon Valley

Odessa Silicon Valley

Cost:50 million euros
Payback period:from 7 to 10 years
Goals and Description:

create a unique scientific and industrial area, bringing together a venture, scientific, educational, and business component with a full infrastructur…