Construction of a boiler room and cogeneration unit on alternative fuel on the basis of the “Salve” boiler house

Construction of a boiler room and cogeneration unit on alternative fuel on the basis of the “Salve” boiler house

Project cost

6 mln EUR

Project goal

Construction of a boiler room and cogeneration unit on alternative fuel (sunflower husk) on the basis of the boiler house “Salve” (Klinova Street, 2) with a capacity of 1.5 MW / h. The implementation of the project will reduce the energy dependence of the neighborhood and provide it with a reliable source of heat supply.

Implementation period

1 year

Expected result

For the city:
Replacement of a decommissioned boiler with a cogeneration unit — bio-TPP (Thermal Power Plant); Replacement of the use of natural gas with local raw materials — pellets from sunflower husk and straw;Reduction of expenditures from the local budget for heating of the communal institutions
Natural gas savings: 1.24 million m3 per year. CO2 emission savings: 2447 tons per year;

For investor:
making a profit from the sale of thermal energy

Interested in funding this project?