Projects

Construction of drainage systems and energy efficiency systems

Construction of drainage systems and energy efficiency systems

Project cost

Upon request

Project goal

The project will allow to stop the discharge of untreated stormwater from the Kotovskiy housing estate via Kryzhanovskaya balka into the sea and send them to the sewage treatment plant of SBO «Severnaya».
Construction of a drainage system of the coast from Arcadia to 16 st. B. Fontan in Odesa consumers of household sewage beach and its vicinity are planned to be placed along four technologically and structurally separated sewage pool

The variant of semi-divided sewage system will provide an improvement in the operation of the wastewater disposal system of the Chernomorskaya balka, since this option provides for the complete replacement of existing reservoirs with new ones that will ensure trouble-free operation of the water disposal system

Provision of individual hot water supply using a solar system with vacuum solar collectors for a pool of 121 municipal educational institutions and 19 municipal health facilities.

Construction of a boiler-house and cogeneration plant using alternative fuel (sunflower husk) based on the “Salve” boiler-house ( Klinovaya str., 2) with a capacity of 1.5 MW / h. The project implementation will reduce the energy dependence of the microdistrict and provide it with a reliable source of heat supply.

Financial Conditions

Governmental funding/loans/grants

Interested in funding this project?

Contact us

Your message has been sent

We'll contact you shortly.