Construction of a complex for sorting solid household waste at a dump SMW — 2 (Solid Municipal Waste)

Project cost
for the first variant – 12 010 000 €; for the 2nd variant – 1 220 000 €
Project goal
The project provides:
- the warehouse of the briquetted useful wastes, suitable for processing as raw materials;
- an area for bulky waste;
- an administrative building (2 floors);
- an area for the accumulation of waste (tails not suitable for recycling, intended for export to solid waste landfills);
- checkpoint, weighing complex, disinfection complex;
- parking lot, administrative building and water supply, sewerage and electricity supply facilities.
The area is fenced. There is one road entrance to the territory.
Expected result
For the city:
The complex is designed for reception and short-term storage and disposal of especially hazardous waste. With the purpose of creating a system of accounting and control in the field of waste management, reducing the environmental burden on the environment and the health of citizens.
For the investor: making a profit.
Implementation period
12 months
Municipality assistance
Landfill lease
Investor interest
Making a profit from operation
Interested in funding this project?
Contact us