Projects

Construction of a complex for sorting solid household waste at a dump SMW — 2 (Solid Municipal Waste)

Construction of a complex for sorting solid household waste at a dump SMW — 2 (Solid Municipal Waste)

Project cost

for the first variant – 12 010 000 €; for the 2nd variant – 1 220 000 €

Project goal

The project provides:

  • the warehouse of the briquetted useful wastes, suitable for processing as raw materials;
  • an area for bulky waste;
  • an administrative building (2 floors);
  • an area for the accumulation of waste (tails not suitable for recycling, intended for export to solid waste landfills);
  • checkpoint, weighing complex, disinfection complex;
  • parking lot, administrative building and water supply, sewerage and electricity supply facilities.

The area is fenced. There is one road entrance to the territory.

Expected result
For the city:

The complex is designed for reception and short-term storage and disposal of especially hazardous waste. With the purpose of creating a system of accounting and control in the field of waste management, reducing the environmental burden on the environment and the health of citizens.
For the investor:
making a profit.

Implementation period

12 months

Municipality assistance
Landfill lease

Investor interest
Making a profit from operation

Interested in funding this project?

Contact us

Your message has been sent

We'll contact you shortly.