-
Reconstruction of engineering networks and their integration with the city sewerage
13 mln UAH
Creation of a single city cable sewerage of low-current networks.
-
Pharmaceutical complex with an individual development center for the medical products
252 mln $
The complex will include the construction of factories for medical materials, bioadditives, veterinary drugs.
-
Street sunlight of new generation
Upon request
Intelligent self-inclusive solar lanterns designed for outdoor lighting in private and urban buildings, equipped with advanced LED and photovoltaic te...
-
Street lighting using LED technology
10,0–60,0 mln €
Providing quality street lighting according to European standards for reduction of budget expenditures for electricity bills.
-
Provision of individual hot water supply using a solar system with vacuum solar collectors for a pool of 121 municipal educational institutions
3,21 mln € (121 objects)
Providing individual hot water supply using a solar power system with vacuum solar collectors. Installation of solar system equipment and rehabilitati...
-
Reconstruction of the sewage system in the territory of the Savitsky Park and the accumulating pond of the former Jute factory
650 000 €
The territory of Savitsky Park is 26.7 hectares. There is a pond in the park that needs to be renovated into proper sanitary and aesthetic condition.
-
Construction of a complex for sorting solid household waste at a dump SMW — 2 (Solid Municipal Waste)
for the first variant – 12 010 000 €; for the 2nd variant – 1 220 000 €
The complex for sorting solid household waste is planned to be located on the closed landfill SMW-2 between Shkodova Gora and Khutorskaya Streets in O...
-
Mobile application of Odesa citizen “Odesa Pulse”
Upon request
Creating an application — a personal digital assistant for citizens of Odesa to use the city services.
-
The project of construction of a water drainage system of the Kryzhanovskaya balka in Odesa (the second stage)
18 mln 258 thousand — 33 mln 474 thousand EUR
To solve the problem of pollution of the Black Sea by storm sewage in the northern part of the city, a feasibility study of the sewage system of the K...
-
Waste sorting and recycling complex
Upon request
Complex at landfill “Dalnytskyi careers” includes waste sorting and recycling line, garbage recycling line, landfill degassing complex and provides Eu...
-
ACCELERATOR OF URBAN PROJECTS «BETAMISTO»
upon request
The concept of an accelerator is to involve startups in solving city problems and tasks.
-
Construction of a boiler room and cogeneration unit on alternative fuel on the basis of the “Salve” boiler house
6 mln EUR
Construction of a boiler room and cogeneration unit on alternative fuel (sunflower husk) on the basis of the boiler house “Salve"